There a few steps to a split system installation. As the name implies the split system is made up of two separate components, one indoor and one outdoor unit.
Step 1. Mounting the system
We will, based on the quote and area that we are servicing, we will install the mounting bracket for your indoor unit inside the desired location of the room. This is what is used to hold the system.
Step 2. Create the hole
We will then create the hole through the wall which is how we connected the pipework and electrical from the outdoor unit to the indoor unit and run our drainage lines which removes the condensation water from the unit
Step 3. Running the connections
It is now time to run all pipe and wires through the hole that has been made.
Step 4. Securing the indoor unit
Your indoor unit will now be mounted onto the bracket and will then connect the pipe and wiring to the back of the indoor unit
Step 5. Lets go outside
Your condenser unit (outdoor unit) will be placed into position. Your outdoor unit on mounting blocks, rubber feet of wall brackets we will secure the outdoor unit in your desired location. Once the outdoor is secure we will then connect the pipe work and electricals that we had fed through in step 3 and your system is now ready for commissioning.